Panattoni Park Reading
connor
on
September 24, 2025

Panattoni Park Reading
The latest speculative logistics development proposed in the M4 Corridor.
Two speculative build warehouse/logistics opportunities
50,329 & 56,124 sq ft
or a combined unit of 106,453 sq ft
On-Site Q1 2026, Available Q1 2027
Panattoni Park Reading is excellently located with more than 2.1 million people living within a 45-minute commute. Its location, directly on J12 of the M4, giving access to over 65% of the UK’s population within a 4.5 hour drive time. Panattoni Park Reading provides direct access to London, to the east, the Western Corridor and beyond.
The units have been designed with a sustainable future in mind, featuring best in class ESG credential reducing occupational costs and catering to the requirements of the modern day occupier, safeguarding against the requirements of tomorrow.

Location
Panattoni Park Reading will serve industrial/logistics occupiers in the Thames Valley.
- Google Map
- HGV Drive Times
- Drive to Work Times
- Demographics

Places
Miles | Hrs:Mins | |
---|---|---|
Reading | 5.5 | 0:10 |
Green Park Business Park | 6 | 0:11 |
Newbury | 13 | 0:27 |
Bracknell | 15 | 0:25 |
Basingstoke | 18 | 0:35 |
Slough | 27 | 0:39 |
M4/M25 Junction | 29 | 0:41 |
Oxford | 35 | 0:51 |
West London | 37 | 0:56 |
Southampton | 52 | 1:15 |
Airports
Miles | Hrs:Mins | |
---|---|---|
Heathrow | 31 | 0:41 |
Luton | 61 | 1:22 |
Gatwick | 62 | 1:28 |
Stansted | 89 | 1:50 |
Ports
Miles | Hrs:Mins | |
---|---|---|
Southampton | 56 | 1:11 |
Bristol | 80 | 1:36 |
London Gateway | 95 | 2:14 |
Dover | 124 | 2:32 |
Felixstowe | 145 | 2:59 |
Ready to work
in Reading

19,900 people
Want a job
86,500+ peoplw
Economically active population
Source: NOMIS 2025
Masterplan

Base Specification
Clear internal height | 10m |
Yard depth | 50m |
Roof lights | 15% |
Floor loading | Up to 50 kN/m2 |
Grid power | 1 MVa |
PV capacity | 200 KVa |
EV charging points | Yes |
Sustainable Specification
Meets ESG standards |
Targeting BREEAM ‘Excellent’ |
Targeting EPC ‘A+’ Offices, EPC ‘A’ Warehouse |

Reading 50
Accommodationsq ft | sq m | |
---|---|---|
Warehouse | 45,498 | 4,227 |
First floor offices | 4,831 | 449 |
TOTAL (GEA) | 50,329 | 4,676 |
Level access doors | 2 |
Dock doors | 5 |
Yard depth | 50m |
Power supply | 700 KVa |
Car parking spaces | 60 |
HGV trailer spaces | 10 |

Reading 56
Accommodation
sq ft | sq m | |
---|---|---|
Warehouse | 51,293 | 4,765 |
First floor offices | 4,831 | 449 |
TOTAL (GEA) | 56,124 | 5,214 |
Specifications
Level access doors | 2 |
Dock doors | 5 |
Yard depth | 50m |
Power supply | 700 KVa |
Car parking spaces | 60 |
HGV trailer spaces | 10 |
Media
- Downloads
- Gallery